Friday, February 28, 2014
Thursday, February 13, 2014
Snow February 2014
| Standing on front porch looking to the right. |
| Standing on front porch looking to the left. |
| One small step for a man... |
| This begins a sequence from right to left. 1. |
| 2. |
| 3. |
| 4. |
| 5. |
| View from bedroom window of back pasture. |
| View from bedroom window. |
| Back deck seen from kitchen window. |
| Back deck seen from kitchen window. |
| Bird house as seen from kitchen window (zoomed in). |
| Pasture as seen from kitchen window (zoomed out). |
| Shed roof. |
| Between carport and shed. |
| Hydrangeas |
| Next door neighbor, tree and gas tank. |
| Home sweet home. |
| back steps |
| Other neighbor, from bedroom window. |
| Pictures from the "Snow room" 1 |
| Pictures from the "Snow room" 2 |
| Pictures from the "Snow room" 3 |
| Pictures from the "Snow room" 4 |
| Pictures from the "Snow room" 5 |
| Pictures from the "Snow room" 6 |
Tuesday, January 21, 2014
Two New Razors
This is the Ever-Ready 1924 "Shovelhead." It is a single edge razor that hinges on the front. This one is in really nice shape, and I am looking forward to trying it out. I am happy to add it to my collection.
This is a Gillette travel tech, B1. So it was manufactured in 1956. These have little short handles, but they are great shavers. I have one from 1962 that is in a leather case already, but this one was sold with the ER 1924, so, I gladly took it. I may gift it some time later.
Wednesday, January 15, 2014
Micah Has Arrived
Friday, December 27, 2013
New Floors
Day 1
Son David inspired this home improvement. He replaced the flooring in his bathroom, and we saw his handiwork during our recent visit. We found a really good deal at the Home Depot in Hendersonville, and now I have one bathroom done and one to go.
Day 2
I stripped out two layers of flooring and replaced it with this. It took me about 4 hours today: work a little, rest a little, work a little, rest a little. My beautiful bride helped with the floor removal and clean up. Thanks, Sweetie.

Tuesday, December 24, 2013
New Water Heater (revisited)
Back in September I decided to go ahead and replace our water heater. It was manufactured in 1993, and so, it was a problem waiting to happen. Normally, I have replaced my own water heater, but this one was a nightmare. Look at the plumbing before the replacement.
September 18, 2013
The plumber did away with all the unneeded mess. He made a manifold under the house and ran one line up to the heater and one line back down. The result was a nice clean installation.
The water heater lives between our air handler and a closet wall. Here is the closet put back into place after the installation.
I plan on calling on Tanner Plumbing again when I decide to replace the old polybutylene pipes.
Wednesday, December 18, 2013
Bathroom Vanity Redo
Wednesday, December 18. Today, I ripped out the old vanity in the Master Bath. I was able to install the new countertop and sinks. I will be replacing the floor and making a new front with three doors.
| This is the before picture. We had already painted the walls. The new top is an inch and a half deeper, and I raised it 3.5 inches. |
Thursday, December 19
![]() |
I rebuilt the floor for the vanity, and we bought new medicine
cabinets/mirrors. Tomorrow we will be redoing the water
supplies and put in cut-off valves.
|
Friday, December 20, Happy birthday, Tim.
![]() |
My neighbor friend, Phil L., came over and helped me redo the water supply
under the sinks. Now, I have cut-off valves. |
![]() |
After Phil left, I finished off the frame for the vanity. This
is the fitting. It fit. |
![]() |
Here it is sanded and stained. Marcia picked out the stain,
Golden Oak. It is just right. |
I also finished the doors and put concealed hinges on them. Tomorrow, I will be putting a couple of coats of poly on the frame and the doors. Because of the smell, I will leave them in the shed a day or two before final installation. More to come...
Saturday, December 21
![]() |
Two coats of poly, new door knobs, doors hung, and initial final fitting.
I am very satisfied.
|
![]() |
| Before and after. Click on picture to enlarge. |
December 23
![]() |
| I put in two slide out shelves in the middle section. Now, it is done. |
Subscribe to:
Posts (Atom)























