Wednesday, December 18. Today, I ripped out the old vanity in the Master Bath. I was able to install the new countertop and sinks. I will be replacing the floor and making a new front with three doors.
This is the before picture. We had already painted the walls. The new top is an inch and a half deeper, and I raised it 3.5 inches. |
Thursday, December 19
I rebuilt the floor for the vanity, and we bought new medicine
cabinets/mirrors. Tomorrow we will be redoing the water
supplies and put in cut-off valves.
|
Friday, December 20, Happy birthday, Tim.
My neighbor friend, Phil L., came over and helped me redo the water supply
under the sinks. Now, I have cut-off valves. |
After Phil left, I finished off the frame for the vanity. This
is the fitting. It fit. |
Here it is sanded and stained. Marcia picked out the stain,
Golden Oak. It is just right. |
I also finished the doors and put concealed hinges on them. Tomorrow, I will be putting a couple of coats of poly on the frame and the doors. Because of the smell, I will leave them in the shed a day or two before final installation. More to come...
Saturday, December 21
Two coats of poly, new door knobs, doors hung, and initial final fitting.
I am very satisfied.
|
Before and after. Click on picture to enlarge. |
December 23
|
I put in two slide out shelves in the middle section. Now, it is done. |