Cantrell Hills Progress 2

I took these pictures about 1:45 PM today, Wednesday. The wall is now 12 courses of block tall. They are filling in behind the wall in these pictures. They are getting the fill dirt from the pile of dirt right behind our house.


At the other end of the wall, the crew is working to complete that end.







Update: 5 PM

I went down to check the progress and was able to talk with one of the engineers. They are putting the final course of blocks on now. So, that is about 15 courses high.


Thursday: 4 PM, 

The wall is almost finished. They have a few blocks to finish on the far end, and then they will put cap blocks on last.







They have about three feet of dirt to fill in behind the wall on the far end.


This one is right behind our house. The big hill of dirt is going away fast. They are using this dirt to fill behind the block wall. 


September 17: They finished the wall with a top cap and are doing back filling now.

Taken around 3:00PM.





Update: September 18

Taken at 9:28 am

Taken at 1:30 pm

Taken at 3:10 pm