Wednesday, December 18.  Today, I ripped out the old vanity in the Master Bath. I was able to install the new countertop and sinks. I will be replacing the floor and making a new front with three doors.
| This is the before picture.  We had already painted the walls. The new top is an inch and a half deeper, and I raised it 3.5 inches. | 
Thursday, December 19
|  | 
| 
I rebuilt the floor for the vanity, and we bought new medicine  
cabinets/mirrors.  Tomorrow we will be redoing the water  
supplies and put in cut-off valves. | 
Friday, December 20, Happy birthday, Tim.
|  | 
| 
My neighbor friend, Phil L., came over and helped me redo the water supply under the sinks. Now, I have cut-off valves. | 
|  | 
| 
After Phil left, I finished off the frame for the vanity. This is the fitting. It fit. | 
|  | 
| 
Here it is sanded and stained.  Marcia picked out the stain, Golden Oak. It is just right. | 
I also finished the doors and put concealed hinges on them. Tomorrow, I will be putting a couple of coats of poly on the frame and the doors. Because of the smell, I will leave them in the shed a day or two before final installation. More to come...
Saturday, December 21
|  | 
| 
Two coats of poly, new door knobs, doors hung, and initial final fitting. 
I am very satisfied. | 
|  | 
| Before and after. Click on picture to enlarge. | 
| 
December 23  | 
| I put in two slide out shelves in the middle section. Now, it is done. | 
 